Generally, when installing an indoor LED display, the module can be installed after the stainless steel frame is installed. This step involves the order of the LED module discharge, the assembly of the cable, etc. There are many things to pay attention to. LCf LED display manufacturers briefly summarize.


02.png



It is recommended to install the module from the bottom to the top, starting from the middle to the two sides. There are many disputes about this installation method. The main purpose of installing from the bottom is to keep the horizontal and vertical within the normal control range, especially when the area of the screen is large, it is more likely to get out of control, especially the requirement of small spacing is too high, and there are some gaps. If the requirements are not met, fine adjustments are required.




Even if the precise mold comes out of the module or box, there are still errors, and the misalignment of a few wires will lead to the misalignment of the entire row. Secondly, the installation from the middle to the two sides can be divided into two groups or even four groups of personnel to work in division of labor, saving installation time. Even if the installation is misplaced, it will basically not affect the progress of another group of people.




Install the cable that comes with the module according to the drawing. The short cable is only suitable for the connection between the modules and the module. The long cable from the control card to the module needs to be installed in the length of the cable sequence. The connection sequence between modules, It is the previous input connected to the output behind the previous module.